5Tatva
Setup Storage gateway and move application data from EBS Block Volumes to S3 in order to save cost.
Customer has setup application on EC2 machines and data was being stored on respective EBS volumes. They had requirement of high IOPS therefore they kept the application data on EBS but it was incurring high cost as there was high amount of data being stored on EBS. Hence to save cost, S3 storage was advised to save storage cost along with storage gateway to cater the high IOPS requirement.
Client:
5Tatva
Category:
Marketing/Finance
![](https://tekrosta.com/wp-content/uploads/2020/09/project-details.jpg)
There was a time when India was not known to produce quality engineering products, it took a visionary to break that perception. Sujata was born in 1979 with a continuous pursuit of perfection. Shri Brij Mohan Mittal, their esteemed founder, took it as a challenge to innovate, design, and completely manufacture a world-class product in India. Sujata has built its legacy over forty years, with its mixer grinder, trusted and loved by housewives across India for excellence in performance and proven durability. At Sujata, they have always believed in evolving with the times, pushing the envelope in product design and innovative technology to bring out the finest of products
01. Problem Statement
Due to high storage cost of application data, customer was looking for cost effective solution.
02. Proposed Solution & Architecture
Following steps are performed to setup automated data replication from on-prem to AWS
- Setup Network components like VPC, Subnets, and Routing Tables etc.
- Setup S3 for, application data storage
- Setup Storage Gateway and mount respective NFS share on EC2 application servers.
our industries
Service Used In 5Tatva
We help you see the world differently, discover opportunities you may never have imagined and achieve results that bridge what is with what can be.
S3
EC2
Storage Gateway
EBS
03. Results
- Successful storage of application data on S3
- Desired Read and Write IOPS to NFS file share is achieved as per application requirement.
04. TCO Analysis Performed
3-year and 5-year TCO analysis has been done, as follows considering future scale of growth –
- 3-Year TCO – $216K
- 5-Year TCO – $540K